Five stages from requirements to handover
Our Approach
From understanding project requirements and developing engineering solutions, through execution in accordance with technical specifications and cGMP requirements, to documenting the work and preparing a comprehensive project handover dossier.
- 01Stage 01
Requirements study & site survey
Understanding the facility’s requirements and scope, and surveying the site and execution conditions.
- 02Stage 02
Engineering, design & planning
Drawings and routing, material and finish selection, and the execution, inspection and documentation plan.
- 03Stage 03
Fabrication, preparation & execution
Tube and assembly preparation, Orbital welding, fabrication and on-site installation.
- 04Stage 04
Inspection, verification & testing
Internal camera inspection where required, penetrant testing, pressure and leak tests, and passivation where applicable, within the scope agreed with the client.
- 05Stage 05
Documentation & handover
System handover with the agreed documentation package: weld and inspection records and project documents.
The scope of each stage depends on the nature of the project and the agreement with the client.